File No. SS-AP-HSG-001 · Andhra Pradesh State Scheme · Andhra Pradesh State Housing Corporation Limited (APSHCL)

NTR Housing Scheme (Pedalandariki Illu)

A pucca house for BPL families in Andhra Pradesh who don't own one.

What this scheme offers

Known formally as Pedalandariki Illu ('a house for everyone') and branded NTR Housing Scheme, this programme addresses BPL families in Andhra Pradesh who have neither a pucca house nor land to build one on. It offers both pieces at once: free house-site land — 3 cents in rural areas, 2 cents in urban areas — plus a construction subsidy of ₹1.5 lakh for rural beneficiaries and ₹2.5 lakh for urban beneficiaries, with an additional ₹50,000 for SC/ST families to help close the gap further. Houses run 300-450 sq ft and come with basic energy-efficient fittings. The programme has delivered roughly 4 lakh houses so far against a target of about 10 lakh, so a place on the list doesn't mean immediate construction — timelines depend on your district's rollout phase.

Who is eligible

  • BPL family in Andhra Pradesh with a white ration card.
  • Does not currently own a pucca house or house-site land anywhere in the state.
  • Household annual income within ₹3 lakh.
  • Landholding within the limits prescribed (not exceeding roughly 2.5 acres wet land or 5 acres dry land).
  • Has not previously benefited from another central/state housing scheme for the same purpose.

Documents required

  • Aadhaar card
  • White ration card (BPL)
  • Income certificate
  • 'No pucca house/house-site' declaration
  • Caste certificate, for the SC/ST additional grant
  • Bank account details (Aadhaar-linked)

How to apply

  1. Check your eligibility and application status through your village/ward secretariat or the AP Housing portal.
  2. Submit BPL, income, and identity documents as part of the beneficiary survey/application process.
  3. Your details are verified against land records and existing housing-scheme beneficiary lists to avoid duplication.
  4. Once sanctioned, house-site allocation (where needed) happens first, followed by staged construction-subsidy disbursal tied to construction progress.
  5. Track your status through the AP Housing Beneficiary List / Gruha Pravesh Mahotsav list published periodically.