File No. SS-LA-UTL-001 · Ladakh UT Scheme · Power Development Department (LPDD)

Ladakh Rooftop Solar Subsidy (PM Surya Ghar with UT Top-Up)

Residential rooftop solar in Ladakh gets the Centre's special-category subsidy plus a UT top-up of ₹20,000 per kW, for ₹53,000, ₹1,06,000 and ₹1,35,800 on 1, 2 and 3 kW systems, with no subsidy above 3 kW; commercial establishments have their own scheme.

What this scheme offers

Ladakh is a special-category region under the PM Surya Ghar Muft Bijli Yojana, and on 26 June 2024 the UT administration added its own top-up subsidy. For a household, the Centre pays ₹33,000 per kW for the first 2 kW and ₹19,800 for the additional kW up to 3 kW, and the UT adds ₹20,000 per kW for the first 2 kW and ₹10,000 for the third. That makes a total subsidy of ₹53,000 for a 1 kW system, ₹1,06,000 for 2 kW and ₹1,35,800 for 3 kW; there is no subsidy above 3 kW, though up to 10 kW can be installed under a contract. In 2026 the department invited bids to install 1–3 kW systems for up to 7,000 households with five years of maintenance, and a separate scheme for commercial establishments such as hotels and guest houses was inaugurated in September 2025.

Who is eligible

  • A household electricity consumer in Ladakh with a suitable rooftop, registered on the PM Surya Ghar portal.
  • The subsidy applies to grid-connected systems up to 3 kW; there is no subsidy beyond 3 kW.
  • Systems up to 10 kW can be installed with a contract agreement, but only the first 3 kW attracts a subsidy.
  • Commercial establishments are covered by a separate UT scheme.

Documents required

  • Electricity consumer number and a recent bill
  • Aadhaar card and proof of ownership or consent for the rooftop
  • Bank account details for the subsidy
  • Registration on the PM Surya Ghar portal
  • Technical feasibility report from the empanelled vendor or department

How to apply

  1. Register on the national portal pmsuryaghar.gov.in with your consumer number and choose Ladakh.
  2. Select an empanelled vendor or contact the Power Development Department's Executive Engineer in Leh or Kargil.
  3. The site is surveyed and the system installed; the department verifies it and installs the net meter.
  4. After commissioning is confirmed, the central and UT subsidies are credited to your bank account.
  5. Keep installation and inspection documents for any later queries.